In March, work will begin on a new Route 1 interchange in Virginia to handle six additional lanes on the Capital Beltway, while work on a revamped Telegraph Road interchange is to start in April.
In addition, Route 1 is included in the Corridor 1 and 2 alternative studies for the Inter County Connector:
Corridor 1: This corridor
follows the general alignment set by Montgomery and Prince George's counties
in their master plans. The alternative route extends from I-370/ I-270
near Shady Grove to US 1 south of Laurel. Several alignment options in
this corridor will be considered in the vicinity of Rock Creek Park and
Pain Branch Park.
Corridor 2: This corridor extends from I-370/ I-270 to I-95/ US
1 south of Laurel. From I-370 to MD 97 (Georgia Ave.), this corridor will
be identical to Corridor 1. However, at MD 97, it curves to the east and
continues to the north side of MD 198, crossing I-95 near Corridor 1,
and terminating at US 1 north of Muirkirk Road.
Back to Road main page
*Information from MDOT State Highway Administration and USDOT Federal Highway Administration: ICC Study, Alternatives Public Workshops literature