Author: Elena Sorokina

What’s our vision for a next generation of transit?

Fifty years ago, visionary leaders conceived, planned, and built Metro, radically reshaping the Washington DC region. Today Metrorail is a national example of how a well-planned transit system can help fuel economic growth by revitalizing communities and helping hundreds of thousands of people get where they’re going each day. But where’s the plan for the next generation?


Regional transit map by John Peck and Aimee Custis for CSG. Click for full version (PDF).

Today, with a new report, Thinking Big, Planning Smart: A Primer for Greater Washing­ton’s Next Generation of Transit, the Coalition for Smarter Growth wants to engage residents in a campaign to win a new transit vision and the funding to implement it.

Regional leaders have expressed strong support for transit-oriented development in their Region Forward vision and in recent state of the county addresses, but our regional transportation plans are dominated by a never-ending list of new highways and road expansion projects, with a few disconnected transit projects.

Just two weeks ago, the Virginia Department of Transporation (VDOT) added a number of new road projects to the regional plan, but not a single transit project. While the road projects march forward, transit projects are forced to beg for funding.

So, our report is both a call to action and a baseline resource. It offers the first compilation of the region’s many transit and transportation plans, briefly summarizes the many benefits of transit to the DC region, and features and compares the metrics for six major transit projects or systems that are under construction or reasonably far along in planning, including the Silver Line, Purple Line, DC Streetcar, Arlington Streetcar, Alexandria Bus Rapid Transit and Montgomery Rapid Transit System.

A CSG volunteer, John Peck, worked to create a base map of all of the current rail transit lines and the six systems featured in the report. We gained a respect for the GIS professionals!


Transit projects comparison. Click to enlarge (PDF).

While we are encouraged by the new transit systems being proposed, we are very concerned that the region has no plan to interconnect the systems nor to ensure operational coordination including common fare card use and real time information, not to mention who should operate each system. We also found that the studies for these systems don’t share a common set of performance measurements. So we owe it to University of California engineering student Haleemah Qureshi for creating the first comprehensive, comparative table of metrics derived from the technical reports for each of the featured transit systems.

How do we get there?

“Make no little plans. They have no magic to stir men’s blood and probably will not themselves be realized.” Daniel Burnham’s quote is perhaps overused, but nevertheless, we need a regional commitment to a new transit plan, the funding to support it, and a hardnosed commitment to implementing it.

We are recommending extensive public involvement and modern crowdsourcing. We believe that a joint committee of elected officials who serve on the WMATA and Council of Governments boards, should oversee the process and complete a plan within two years. WMATA staff, who have been leading the PlanIt Metro analyses and the development of the Momentum program, should provide the lead technical support, and be assisted by COG staff and local transportation and land use planners. Your thoughts on the process?

Finally, our report includes a recommended set of principles to justify and guide the development of a new transit vision. Do you agree? What might be missing?

Principles to guide a next generation of transit

High-capacity public transportation is the most important investment for supporting a sustainable region of livable, walkable centers, and neighborhoods.

Several factors make public transportation investments critical:

  • High energy prices and the high cost of auto transportation
  • Climate change
  • Air and water pollution
  • Failure of road expansion to effectively manage traffic, due to induced demand and related inefficient patterns of auto-dependent development
  • The significant number of residents who cannot drive, cannot afford a car or do not own a car. This includes lower-income residents, the disabled, the young and elderly, and the growing sector of our population seeking to live in communities where they do not have to be dependent on a car.
  • The benefit public transportation provides in supporting compact, efficient development, lowering per capita infrastructure costs and saving land.

Rehabilitating and improving our Metrorail system must be our first priority.

Major public transportation investments must be tied to good land use: well-designed, compact, mixed-use, mixed-income, walking and biking-friendly neighborhoods with interconnected local street networks – both transit-oriented development and traditional neighborhood development.

Supporting build-out at our existing Metro stations should be a priority, and together with mixed-use development at all stations, will ensure that our Metro trains have high ridership in both directions all day.

New high-capacity public transportation corridors must include the region’s commercial/retail corridors. Given the strong commitment to preserving the character of existing suburban neighborhoods, these commercial corridors offer the best opportunity to absorb regional growth while protecting suburban neighborhoods.

We should be flexible and not locked into one public transportation mode as the answer. We should ensure we match the public transportation mode, design and service plan to the land use densities and levels of service we are trying to achieve.

Public transportation planners should ensure that each public transportation study considers all modes and the necessary mixed-use, walkable, and transit-oriented urban design essential to maximizing ridership and the value of the public transportation investment. Safe and robust access to public transportation by promoting walking and bicycling and supportive local street networks must be a part of any public transportation and funding plan.

Continuing to debate the mode after a final vote by an elected board or council isn’t constructive. It delays and even harms the advancement of much needed public transportation investments.

We can be proud of our region’s success with transit and transit-oriented development. But without the commitment of the public and our elected officials, we’ll fail to make the investments in the next generation of transit that are necessary to support the demand for transit-oriented communities, to offer an alternative to sitting in traffic, and to fight climate change.

With this report and the engagement of CSG members and GGW readers, we aim to spark a new transit plan for the region. In the coming weeks, we’ll be speaking to local elected officials, the WMATA board, the Council of Governments, the Northern Virginia Transportation Commission, transportation and land use planners, and the public. Stay tuned.

UPDATE 3/5/13: CSG has launched a Next Generation of Transit feedback catalog, where we’ll be cataloging feedback, comments, ideas and suggestions. Keep the conversation going in the comments below, but we also encourage you to check out and contribute to the catalog.

Photos courtesy of CSG via Greater Greater Washington

Read the original article on Greater Greater Washington>>

Coalition For Smarter Growth Report Calls For A Next Generation Of Transit

We don’t need a ranking to know our traffic is bad.  What the headlines miss is the crucial role our Metro and our other transit investments have played in preventing gridlock, in offering us an effective alternative to sitting in traffic, and in fueling an economic boom that has revitalized our city and transit-oriented suburbs.

Download the report – Principles for a Next Generation of Transit (Fact Sheet) – Benefits of Transit to the Region (Fact Sheet)

“Fifty years ago, visionary leaders conceived, planned and built Metro, and reshaped the Washington, D.C. region. The first order of business is to complete the reinvestment and full rehabilitation of this system that is so critical for our regional economy. We are also calling today for a new vision for a new generation — for a Next Generation of Transit investments and the leadership to make it happen,” said Stewart Schwartz, Executive Director of the Coalition for Smarter Growth. “We believe our region’s leadership is ready for the challenge.”

“In the Region Forward regional compact, regional leaders have made transit-oriented development the framework for our region’s growth, but we now need to put the “T into our TOD,” said Schwartz.

Last week, centerpieces of the State of the County addresses by Fairfax Chairman Sharon Bulova and Montgomery County Executive Ike Leggett were their calls for transit-oriented revitalization and new transit investments  Prince George’s County Executive Rushern Baker has called transit-oriented development and the Purple Line top priorities, and D.C., Arlington and Alexandria are national leaders in implementing TOD.

Today’s Coalition report, Thinking Big, Planning Smart:  A Primer for Greater Washington’s Next Generation of Transit, is both a call to action and the first compilation of the region’s many transit and transportation plans. The report summarizes the many benefits of transit to the Washington D.C. region. It features and compares the metrics for six major transit projects and/or systems that are under construction or reasonably far along in planning, including the Silver Line, Purple Line, D.C. Streetcar, Arlington Streetcar, Alexandria Bus Rapid Transit and Montgomery Rapid Transit System.

“While we are encouraged by the many new transit systems being proposed, we are very concerned that we don’t have a plan to interconnect the systems and to ensure operational coordination including common fare card use and real time information, not to mention who should operate each system,” said Cheryl Cort, Policy Director for the Coalition. “We found that the studies for these systems don’t even share a common set of performance measurements and had to crunch the numbers to do our own comparative analysis.”

“This report is a baseline and we hope a launching point for regional dialogue and collaboration to create a plan for a next generation of transit network for our region, said Schwartz. “We’d like to see an official process that brings together elected officials, transit planners, and top national consultants, and fully engages the community.”

Cheryl Cort concluded:  “The Coalition recommends that WMATA (Metro) planning staff provide the lead technical support for the study in accordance with the WMATA compact, and that a joint WMATA/COG committee of elected officials be convened to oversee the effort. Our goal is for the region to complete that plan within the next two years, while launching a concurrent effort to identify and dedicate significantly more funding to our public transportation needs.” The Coalition included a recommended set of principles that justify and should guide the development of the Next Generation of Transit vision.

About the Coalition for Smarter Growth

The Coalition for Smarter Growth is the leading nonprofit organization addressing where and how the Washington region grows, partnering with communities in planning for the future, and offering solutions to the interconnected challenges of housing, transportation, energy and the environment. We ensure that transportation and development decisions accommodate growth while revitalizing communities, providing more housing and travel choices, and conserving our natural and historic areas.

Read the original article here >>

Westphalia developer floats bus plan to lure FBI to Prince George’s County

A $3 billion Canadian real estate firm plans to begin work shortly on what may be Prince George’s County’s largest development since National Harbor, and it is pulling out all the stops to get the FBI to build a headquarters there as a focal point. The Walton Group, one of North America’s largest land developers, purchased the 479-acre Westphalia Town Center project along Pennsylvania Avenue near Andrews Air Force Base in February of last year, and says it will begin construction this month. The first phase of the project calls for 347 town homes, more than 400 apartments, 450,000 square feet of retail and a 150-room hotel. Under previous ownership, the project stalled because of the recession, loan defaults and a conviction on extortion charges for one of the project’s principals. But after buying the property for $29.5 million in February of last year, Walton chief executive Bill Doherty said he is three-to-four weeks from beginning construction. “This is a very real project. We’re moving fast. This is happening,” he said.

Building a bypass

Outer Beltway, North-South Corridor, Tri-County Parkway, Bi-County Parkway, Corridor of Statewide Significance.

It’s been called many things in the 30 years since Virginia’s leaders first recognized the need for a bypass linking Interstate 95 in eastern Prince William to U.S. 50 near Dulles Airport in Sterling. Today, it’s inching closer to reality.

Once projected to be complete in 2035, the Bi-County Parkway – as it is now called in Prince William County – has the support of Secretary of Transportation Sean Connaughton, as well as many regional leaders and interest groups.

Decades ago, Congress also recognized the need to preserve the Manassas National Battlefield by relocating Va. 234 Business out of park, passing two pieces of legislation addressing the issue.

The proposed Bi-County Parkway would do both.

‘A 19th century road system’

“The need for this is growing every day and it is more than obvious we need to go forward. Between Prince William and Loudoun counties we are near reaching a point that there will be almost 800,000 people,” Connaughton,  former chairman of the Prince William County Board of Supervisors, said in a recent interview.

“When we talked about this 30 years ago, people were concerned about growth and what this road would do,” he said. “We’ve now gotten the growth, but we do not have the transportation facilities. That is what this road would do.”

While there are critics, both the Prince William and Loudoun boards of county supervisors support the plan and have included it in their comprehensive plans.

“Prince William and Loudoun counties are two very quickly growing communities and yet if you’ve ever tried to drive between them, you know it’s very difficult,” said Prince William County Supervisors Chairman Corey Stewart, R-at-large during the Prince William Chamber of Commerce’s State of Prince William event last week. “We’ve got a 19th century road

system between those two counties and it’s got to change.”

Deciding a route

When the Virginia Department of Transportation began studying the corridor in the 1980s, it came up with several routes, some traveling through Fairfax County.

In May 2011, the Commonwealth Transportation Board defined the 45-mile corridor in question as “the area generally east and west of the Route 234/Prince William Parkway and the CTB-approved location of the Tri-County Parkway between Route 95 and 50, and connections to the Dulles Greenway and Route 7.”

Last June, the CTB approved $5 million to start engineering and design work for a 10.4-mile section of the project.

The Bi-County Parkway would begin near the intersection of Interstate 66 and Va. 234 Bypass/Prince William Parkway. It would make a zigzag around Manassas National Battlefield Park, run along U.S. 29 and then follow Pageland Lane along the northern side and western edge of the park. The parkway then would extend north to U.S. 50 in Loudoun County near Dulles.

A second part of the corridor project, now being called the Loudoun County/Tri-County Parkway, would link State Route 7 in eastern Loudoun County to western Fairfax County and Interstate 66. Eventually, the corridor would wind its way to Interstate 95 in eastern Prince William.

Proposed routes and timeframes for the rest of the project are still on the table. For now, Connaughton and county leaders are pushing to see the 10-mile stretch from the 234 Bypass to U.S. 50 complete sooner rather than later.

Highway through history

Over the years there have been plans, studies and public hearings. However, the Bi-County Parkway project now has momentum and Connaughton wants to it continue.

“The situation is going to get worse before it gets better and that’s why we need to move forward now,” he said.

As one of the next steps, many major governmental and historic entities need to sign off on a “programmatic” agreement, an agreement in principle, to build the road. Among them are VDOT, the Federal Highway Administration, the state Department of Historic Resources and the National Park Service, which is a key player in what happens next.

Connaughton and Ed Clark, superintendent of the Manassas National Battlefield Park, both said they felt an agreement is near and should be ironed out this year.

“If we can reach a point where the park service believes that the conditions are such and the mitigations are such that it is to the net benefit of the park then we will sign on,” Clark said.

“We are working to ensure that we and other preservation-minded people have the ability to be very directly involved with the design of the (Bi-County) Parkway along the edge of the battlefield to make sure that things like sight and noise are addressed so that you minimized their impact on the battlefield,” Clark said

While the state had always planned to close U.S. 29 and Va. 234 inside the park when the parkway was completed, Connaughton said it is now considering closing portions of those roads as the parkway is built in stages.

Clark said that couldn’t come soon enough. About 52,000 vehicles, of those 13 percent are trucks, travel through the intersection of U.S. 29 and Va. 234 within the park every day.

“A lot of people say, ‘Why would you want a road beside you?’ To get the road out of the middle of it,” Clark said. “We want to get as much of the traffic that we can out of the battlefield.”

Connaughton calls the traffic inside the battlefield “a dishonor to the people who fought the two battles.”

There’s also the tourism lost to congestion.

“We believe this will create a true green space in Prince William where today it is essentially a commuter route,” Connaughton said.

The constant rumble of traffic makes experiencing the battlefield difficult for visitors trying to imagine the park as it was in 1861, Clark said.

Fighting traffic and always having that modern intrusion really distracts from that,” he said.

Finding funding

VDOT estimates the parkway could cost about $210 million to build.

Connaughton said the state does not yet know when it will get under way or exactly how it will be funded.

The General Assembly’s passage of a broad transportation plan to bring money for road and rail to Northern Virginia will likely help, he said. He said some state funds could be spent on engineering for the parkway and right-of-way acquisitions.

But he is hopeful that a private-public partnership, not unlike the one between the Potomac Nationals and the state for a new stadium and commuter parking in Woodbridge, could help fund the parkway.

“It would be our hope to get this project under way in the next five years,” he said.

Support and Opposition

That’s good news to Bob Chase, president of the Northern Virginia Transportation Alliance.

“The need for this and other north-south corridors has been well established for decades,” Chase said. “The need is obvious to people who live in Prince William and Loudoun counties, who need to get to the airport, who need better connectivity to jobs in those two jurisdictions.

“The list of why this is important and necessary is quite extensive,” Chase said.

Yet there are environmental groups and others that disagree. They worry the road will encourage more development in the western Prince William region known as the “Rural Crescent” and encourage more commuting, Instead, transportation improvements should be focused on I-66, U.S. 50 and U.S. 1 in Prince William, they say. They also worry about the impact on the battlefield.

“This ‘dumb growth’ road is designed to bust the rural area. The rural area steers growth so new public facilities that cost residents less in property taxes,” said Charlie Grymes, Prince William Conservation Alliance Board chairman.

He said the parkway would perpetuate high taxes on homeowners and limit the funds needed to meet the Comprehensive Plan goal for new parks, managing stormwater to protect the Chesapeake Bay, and creating the live-work-play community described in the county’s Strategic Plan.

“Our strategic vision is to develop into a place where businesses choose to locate,” Grymes said.

The conservancy wants the county to invest in bringing in new jobs.

“Roads that export workers to other jurisdictions undercut our vision,” Grymes said.

A 39-page letter signed by several opposition groups was sent last summer to comment on the proposed programmatic agreement.

“Our organizations recognize the irreplaceable value of Manassas National Battlefield Park. We share the important goal of removing commuter traffic from the two highways that currently cross the battlefield. However, we are committed to ensuring that the chosen solution does not increase the overall impacts to the battlefield from traffic or simply shift the negative impacts from one area of the battlefield to another – especially when far less damaging alternatives have not been adequately considered,” the letter stated in part.

It was signed by Southern Environmental Law Center, the Piedmont Environmental Council, the Coalition for Smarter Growth, the National Trust for Historic Preservation, and the National Parks Conservation Association.

Connaughton dismisses criticism that the parkway will encourage growth since it has already happened. He said he believes the impact on the battlefield will be positive.

“We think this is just a great opportunity for everyone. It will be good for historic preservation, good for the environment and good for transportation. It’s a win-win-win,” Connaughton said.

 Read the original article at Inside NOVA >>

Photo by Jeff Mankie for Prince William Today

 

Pageland Lane residents see renewal of old fight against Bi-County Parkway in Pr. William


Page Snyder, a longtime resident of Pageland Lane across from the Manassas Battlefield, points to where a proposed four-lane highway would cut through swaths of historic rural farmland. (Jeremy Borden – The Washington Post)

Legendary activist Annie Snyder, before she died in 2002, told her daughter that a road she battled against for decades would never come to fruition.

Snyder spent her life advocating for the preservation of rural lands, particularly those around the Civil War battlefields in Manassas near her home. She doubted that those who wanted to build a 10-mile Bi-County Parkway — which would skirt the battlefield and sit near the front of the Snyders’ family farm — would ever get the funds for such a controversial project, which would run from I-66 in Prince William County to Route 50 in Loudoun County.

The north-south route, supporters say, would create jobs and drive area economic development, ease congestion and provide a key connection between two rapidly growing counties. Detractors, including conservationists and smart growth advocates, say the road would be a boon to rural area land speculators, open up a rural area to development, and bring even more congestion that would result from a large Northern Virginia highway.

It would skirt hallowed Civil War ground, and resistant neighbors bristle at the thought of a four-lane highway competing with what is now bucolic spareness in their front yards.

Page Snyder, Annie Snyder’s daughter, now finds herself ensnared yet again in the fight, and she says she feels that the scales are tipped well in favor of the road. The road’s supporters — namely the administration of Gov. Robert F. McDonnell (R) — have little in their way of seeing the road through, she said.

Still, she’s not resigned. “We’ve won many lost causes that nobody thought we could win,” Snyder said. Since the 1960s, a shopping mall, large cemetery and dirt bike track, among others, have been proposed for nearby lands and were defeated.

While the road project has been with planning boards since the 1980s, several recent events have caused Snyder and others to see Bi-County Parkway (which is often called the Tri-County Parkway because past alignments brought it through Fairfax County) as increasingly a done deal.

In May of 2011, the Commonwealth Transportation Board declared the area as part of a north-south “Corridor of Significance” that could eventually connect Dulles Airport with Interstate 95 and provide a more easily accessible cargo hub, a concept that has wide support among many conservatives and business groups across the state. The National Park Service has largely agreed to the project, and a federal review that assesses the impacts of the roads, called a “section 106” review, is well under way. Officials say they hope to have it completed and signed off on by federal agencies this summer.

Also, last week, the CTB formally adopted a minor tweak in the road’s alignment to avoid a historic property. All told, residents are preparing for the reality of the road even as they continue to fight it.

If the road is built, Pageland Lane residents want to ensure that it does not cut off their access to surrounding roads. They said language in state documents gives the impression that the neighborhood would be cut off, without access to U.S. 29 and the surrounding community. Some alignment proposals could have them getting on the parkway simply to get off to go in the opposite direction.

Those access problems would have other effects. “We have our life’s savings in [our property],” said Mary Ann Ghadban, who lives on Pageland Lane. “If we don’t have access, our property is totally devalued.”

Maria Sinner, a VDOT official who helps oversee projects in Prince William, said that VDOT has not designed or engineered the road’s specifics yet. She said that the state is doing what it can to assure that Pageland Lane residents maintain access to U.S. 29 and the surrounding community.

“We’re going to do anything possible to continue to provide them access,” Sinner said.

There are still key hurdles to the parkway’s construction, even as the McDonnell administration sees the road as a “high priority,” said Sinner. The biggest is the road’s price tag: $300 million. A new funding plan for Virginia transportation means that some long-delayed projects should move forward, but there are competing needs, Sinner said.

“The administration has a high priority on this, but we know they don’t have $300 million right off the bat,” she said. So far, $5 million has been allocated for design work, and officials hope to get about another $15 million for studies this June, subject to a decision by the Commonwealth Transportation Board, the governing body that controls VDOT.

That board is lead by its chairman, Transportation Secretary Sean Connaughton, a former Prince William supervisor, who has long advocated for the road.

“It is our desire to fund and build it as soon as practical,” Connaughton said in an e-mail.

Still, residents feel that VDOT has not been straightforward with them. Del. Timothy D. Hugo (R-Fairfax), whose district includes the area, has scheduled a town hall meeting on Monday at 7 p.m. at Bull Run Middle School with VDOT officials to address concerns.

Stewart Schwartz, the executive director of the Coalition for Smarter Growth, said that the north-south connection when most residents travel east-west in notorious traffic conditions is a waste of state resources. He has called the parkway the “Zombie Road” — because, he says, it’s not needed, and it never dies.

The road, officials say, was formally approved in 2005 and should rightfully be on its way toward construction.

Photo courtesy of Washington Post

Read the original article here >>

Testimony before the Hon. Muriel Bowser, Chair, Committee on Economic Development and Housing Council of the District of Columbia regarding: DMPED Performance Oversight – affordable housing in public land deals

Please accept these comments on behalf of the Coalition for Smarter Growth. We are a regional organization based in the District of Columbia focused on ensuring transportation and development decisions are made with genuine community involvement and accommodate growth while revitalizing communities, providing more housing and travel choices, and conserving our natural and historic areas.

Recommit to leveraging public land dispositions for very low income housing in mixed use projects

Table 1We know that while the city has grown in population and income, low income D.C. residents are experiencing even greater difficulties finding housing they can afford. Thus public lands, and every other realistic tool we have available, should be used to help address this pressing need. Our recent report, Public Land for Public Good, shows that the District has and can do great things with its city-owned land. The creation of mixed income housing opportunities on public land is an important source of affordable housing for our residents.

We highlight the Hine Jr. High School redevelopment project next to the Eastern Market Metro station as a leading example of what a public land disposition should do. The project will offer a great mix of uses, close to 30 percent affordable housing, and a design compatible with a historic district. All of this occurs next to a Metro station, close to the core of the city. The project has been in process since 2008 when the former school site was offered for redevelopment. The project will provide 163,000 square feet of office space, 40,000 s.f. of retail, and a total of 159 housing units. Of the total, 46 units will be affordable, or 29 percent. The mix of affordability for the housing units is a good example of what the city should be seeking in LDAs: 5 units will be affordable at 30 percent AMI, 29 units at 60 percent AMI, 12 units at 80 percent AMI (in lieu of IZ). Other public benefits include reconstruction and opening of a block of C Street SE, and a public plaza along C Street.

The Hine School project pre-dates the current administration. We are concerned that the commitment to affordable housing in recent solicitations for public land dispositions, especially at the lowest income level, is declining. I would be surprised if a DMPED Land Disposition Agreement (LDA) ever again results in 30 percent AMI housing. Current practice by DMPED asks that any residential component meet or exceed Inclusionary Zoning standards of 8-10 percent set aside at 50-80% AMI. IZ is the law and what is required for any residential development. We should expect much more for public land.

Table 1 shows the affordable housing set side and income targeting that was the practice of the last decade for solicitations in public land dispositions. Currently, DMPED’s solicitations provide little of the specificity that was the practice in the past. We urge the council to ensure that we are making the most of the unique opportunity to leverage the value of the District’s land to create more affordable housing through the land disposition process. We ask that the council recommit the District to clearly requesting and prioritizing proposals that offer substantial amounts of affordable housing, including units affordable to those earning 30 percent AMI. As was the practice in the past, we ask that requests specify the city is seeking 20 percent to 30 percent of the total number of residential units affordable at 30 percent and 60 percent AMI for rentals, and up to 80 percent AMI for ownership. We suggest table 2 as a model. In addition, we ask that DMPED better coordinate with other agencies to pool resources to ensure the production of housing affordable at deeply affordable levels as a part of larger mixed income or all-affordable development.

Table2

Management of Affordable Dwelling Units

Since 2009, DHCD created a group to manage affordable dwelling units (ADUs) created through LDAs and Zoning Commission actions, along with IZ units. Given the many challenges to helping moderate and low income households buy and maintain affordable homes, we suggest that this process might be best done through DHCD contracting with a qualified nonprofit. Resale assistance for a price controlled home could benefit from extra attention that a nonprofit could provide to a seller. While we have suggested this for IZ units, we also think that ADU management would similarly benefit.

Thank you for your consideration.

Sincerely,

Cheryl Cort
Policy Director

CSG Releases New Report, “THINKING BIG PLANNING SMART,” Calling for Next Generation of Transit

CSG Releases New Report, “THINKING BIG PLANNING SMART,” Calling for Next Generation of Transit

We don’t need a ranking to know our traffic is bad. What the headlines miss is the crucial role our Metro and our other transit investments have played in preventing gridlock, in offering us an effective alternative to sitting in traffic, and in fueling an economic boom that has revitalized our city and transit-oriented suburbs. “Fifty years ago, visionary leaders conceived, planned and built Metro, and reshaped the Washington, D.C. region. The first order of business is to complete the reinvestment and full rehabilitation of this system that is so critical for our regional economy. We are also calling today for a new vision for a new generation — for a Next Generation of Transit investments and the leadership to make it happen,” said Stewart Schwartz, Executive Director of the Coalition for Smarter Growth. “We believe our region’s leadership is ready for the challenge.”

Thinking Big Planning Smart

Thinking Big Planning Smart

Thinking Big Planning Smart presents a broad synopsis of major ongoing and planned transit projects in the region to serve as a starting point for what we hope will be a constructive dialogue and strategic planning process by planners, policy makers, developers, smart growth advocates and the public. With D.C. studying and implementing streetcars, Montgomery County pursuing the Purple Line and BRT, Arlington streetcars and Alexandria BRT, and Fairfax new transit corridors, it’s an exciting time.

Don’t Get Tripped Up by TRIP! If Most Maryland Roads are in Bad Condition, Then Focus Funds on Maintenance First AND Provide Transit as an Alternative to Sitting in Traffic

The TRIP group (“The Road Information Program”) just issued its annual report on the bad condition of state roads, featuring Maryland and other states and conveniently timed for the state General Assembly debates about transportation funding. “We agree with TRIP that Maryland’s roads and bridges are in need of repair, but TRIP’s primary recommendation has traditionally been highway expansion,” said Stewart Schwartz, Executive Director of the Coalition for Smarter Growth. “This simply doesn’t track. Too often when we see the alarm raised about aging infrastructure, we see new funding go into capacity expansion even as the maintenance needs continue to mount.”

Virginia’s Transpo Future: Charge Drivers Less to Build More Roads

Congratulations are owed to Bob McDonnell. He’s scored a victory on his transportation funding plan, cementing his legacy (though infuriating conservatives, including his hand-picked successor). His achievement is being called the first bipartisan initiative to pass in Virginia in decades. And what does this great deed accomplish? Secure revenue to fuel a new era of wasteful road-building in the commonwealth of Virginia.


McDonnell’s new transportation funding plan will pay for the wasteful and unnecessary expansion of Route 460. Photo: Doug Kerr/flickr

Virginia’s state House and Senate both voted this weekend to approve McDonnell’s funding plan for transportation, despite opposition from anti-tax activists. McDonnell’s original proposal to eliminate the gas tax entirely got massaged a little bit, turning into a 3.5 percent tax on the wholesale price of gas.

His proposal to raise the sales tax survived the legislature, as did the $100 tax on alternative fuels – an idea that is somewhat less backwards now that some semblance of gas tax remains. Democrats hate it, though, and McDonnell has already signaled a vague willingness to “review” it.

The sales tax hike, however, is as backwards as ever. McDonnell is raising the sales tax 0.3 percent in most parts of the state but 6 percent in the populous Hampton Roads and northern Virginia areas. Much of the extra funds raised in those areas will go to local projects, but it still means the most urban and transit-rich areas, where most of the state’s non-drivers live, will pay more for a plan that disproportionately funds rural roads.

Drivers will pay five cents per gallon less than they did under the old gas tax, given current prices — shrinking their contribution by about 30 percent. Rather than strengthen the gas tax’s small but important incentive to drive less, McDonnell’s plan turns it the other way.

The other reason the sales tax hike won’t do the trick is that sales taxes aren’t an appropriate tool when what you need is a stable source of funding.

FTA Administrator Peter Rogoff said the same thing last month when outgoing AASHTO Director John Horsley proposed a percentage sales tax on gas instead of a flat tax. “In transit-land, sales taxes rise and fall with sufficient amplitudes here that it makes or breaks projects,” he told an audience at TRB later in the day when Horsley made his proposal. “Just because it’s a sales tax doesn’t mean that it’s stable.”

According to economists Michael Madowitz and Kevin Novan, writing in the Washington Post, California’s transportation sales tax fluctuated 13.5 percent over the past decade while the fixed gas tax fluctuated just 1.2 percent.

“Given that it is far easier to predict gas consumption than prices,” they wrote, “it is prudent to tie transportation revenue to consumption.”

The one thing that’s predictable about gasoline consumption is that it will continue to drop. People are driving less, and the cars they’re driving are using less gas. Any gas tax solution is only a temporary fix. Does this mean McDonnell is right to want to drop the gas tax altogether? Not at all. Does it mean he’s smart to look to other sources of income for transportation? Of course – though he’s still looking in the wrong place.

Worst of all, the transportation expenditures envisioned in McDonnell’s plan are heavy on sprawl-inducing highways. He touts the multimodal aspects like high-speed rail and finishing the silver line to Dulles airport. But Stewart Schwartz of the Coalition for Smarter Growth characterizes the legislation as “truly a highway bill.” Even the maintenance funds it allocates ($538 million a year) will only serve to free up construction funds for rural highway-building.

Trip Pollard of the Southern Environmental Law Center called the package “too road-heavy” and said, “Virginia has to move toward a more balanced approach that provides greater transportation choices and a cleaner, more efficient system.”

Pollard’s and Schwartz’s organizations, together with other smart-growth groups, lamented the lack of reforms required in the funding bill. “It doesn’t require wiser spending by VDOT even as it effectively allows for about $500 million a year in additional highway construction funding for VDOT,” they wrote in a statement.

In his article for Greater Greater Washington about the bill, Stewart Schwartz wrote about where the money is going:

Just last week, VDOT announced it would allocate another $869 million in federal Garvee bonds to Route 460 and the Coalfields Expressway, two of the most wasteful, unnecessary projects in the history of Virginia. Four questionable projects—Route 460 ($1.4 billion), Coalfields Expressway ($2.8 billion), Charlottesville Bypass ($240 million), and the Outer Beltway in Northern Virginia (estimated $1 billion)—total a potential $5.5 billion in misallocated spending.

Many expect that Secretary Connaughton intends to divert a substantial portion of the new statewide money to the controversial and sprawl-inducing Outer Beltway, rather than to the critical commuter corridor needs of the metro regions.

He notes that just 21 percent of the statewide funds go to transit and passenger rail in 2018.

Photo courtesy of Doug Kerr on flickr

Read the original article here >>