White Flint is fundamentally transforming from an aging auto-oriented commercial corridor to an accessible and vibrant walkable community. On April 27, 2013, CSG brought together together Federal Realty’s Tommy Mann, Friends of White Flint’s Lindsay Hoffman, and Nkosi Yearwood, the Montgomery County lead planner for White Flint, to update us on progress, explore what’s changing and what it means for the neighborhood, and what we can expect in this area as it becomes one of the Washington region’s newest walkable communities. See the event program.
Author: Elena Sorokina
Walking Tour of White Flint
Following the ins and outs of the many redevelopment projects slated for White Flint isn’t easy.
So on Saturday a group of smart growth advocates put together a walking tour of the area to show about 50 area residents what is going on and what they hope to see happen to the strip malls and sidewalks of Rockville Pike.
The D.C.-based Coalition for Smarter Growth, a nonprofit funded by an environmental group, organized “White Flint: Drag to Desirable,” a two-hour tour of the area that included Tommy Mann from developer Federal Realty, County planner Nkosi Yearwood, resident Lindsay Hoffman from Friends of White Flint and Coalition executive director Stewart Schwartz.
They talked about plans for Federal Realty’s Pike & Rose project, underway at Mid-Pike Plaza, and developer LCOR’s North Bethesda Center on the east side of Rockville Pike near the White Flint Metro station. Yearwood answered questions about the realignment of Executive Boulevard, which the county hopes will one day run through what is now Mid-Pike Plaza and the Saab auto dealership across Old Georgetown Road.
Schwartz pointed out some of the less noticeable signs of car-oriented, older suburban planning that still exist on the Pike.
The high-speed right hand turn lane from Old Georgetown Road onto southbound Rockville Pike is one example. Drivers looking to get onto the Pike are more likely to look left for a gap in southbound traffic than to look right for pedestrians crossing at the crosswalk.
There is no tree buffer between the sidewalks of Rockville Pike and the road, a streetscaping tool that is apparent off the Pike near the Bethesda North Marriott and nearby apartment buildings.
Many asked about school overcrowding from new residents in mid-rise and high-rise apartments. The 2010 White Flint Sector Plan includes a new elementary school at the White Flint Mall redevelopment site. Yearwood fielded questions about public amenities, including a green space planned for near Wall Park.
And many wanted to know exactly what was going to be built and when. Mann answered questions about parking and retailers coming to Pike & Rose, the first major mixed-use development coming under the Sector Plan. Phase one will be done next year.
But residents found the bulk of redevelopment for White Flint is going to be a long process in which all the details — road construction, land ownership, the fate of existing small businesses, even a name — aren’t finalized.
Should Virginia Build Another Highway? Study for “Outer Beltway” Released
Plans for a major highway in Northern Virginia are taking shape. Officials say the billion-dollar road would spur growth, but opponents say that premise is flawed.
The Virginia Office of Intermodal Planning and Investment state has released a study to the influential, 17-member Commonwealth Transportation Board (CTB) of a limited access, north-south highway between I-95 in Prince William County and Rt. 7 in Loudoun County, arcing west of Dulles International Airport.
The 600-foot wide “corridor of statewide significance” will eventually extend 45 miles by building upon existing infrastructure, carrying car commuters and express buses to meet forecasted job and population growth. Both counties have in their comprehensive master plans the additional lane capacity, although land use disputes may arise in towns with property in the planned corridor.
“We are in the visioning stage. We have very little money in this project. We have only put $5 million dollars on the project to date,” said Deputy Secretary of Transportation David Tyeryar, who presented the corridor study to the CTB last week. The board is expected to accept the study at its next meeting in May.
“We are still in a phase where we are meeting with the transportation departments of the localities and the landowners and trying to determine a vision for the corridor,” Tyeryar added.
As Transportation Nation has reported, a north-south corridor could theoretically serve multiple purposes: help existing residents avoid traffic congestion, provide lane capacity for expected new residents and businesses, and help turn Dulles Airport into the East Coast’s premier freight hub.
“It’s going to be essential that this route eventually be established and hopefully built,” said Gary Garczynski, the CTB’s Northern Virginia representative and long-time real estate developer. “I’ve been around for 40 years in Northern Virginia and when you see the population and employment figures in this study… you need to have the vision to say we are going to need these roads.”
But studies have shown that building new roads doesn’t necessarily alleviate traffic, and opponents are marshaling objections to the estimated $1 billion price tag as well as the state’s employment and population forecasts in western Prince William and eastern Loudoun.
“Much of the growth projections are based upon plans of the local jurisdictions, not necessarily based upon some sort of demographic and economic analysis,” said Stewart Schwartz, the executive director of the Coalition for Smarter Growth, which favors transit-oriented projects to road building.
“We just raised taxes for transportation, but we didn’t do it to throw away the money. And we have such significant needs in Northern Virginia on the key existing commuter corridors, the funding of Dulles Rail, and fixing I-66,” Schwartz added.
The coalition’s director is also concerned about the public process, accusing the CTB of acting like a “rubber stamp” for Virginia road projects.
“One of the things we’re starting to think we need is an independent transportation planning agency separate from the Virginia Department of Transportation,” Schwartz said.
The CTB would be irresponsible to ignore the need to better move people and goods in Northern Virginia, Garczynski said. “The population and the employment growth is going to happen whether we build the road or not.”
How to fix parking: Price it right, and don’t play favorites
Parking has been called third rail of local politics, and for good reason. At a panel Wednesday on “Getting Parking Right,” Nelson\Nygaard transportation planner Jeff Tumlin put it this way: “People hate the existing system, but they’ll also hate any changes you make to the rules. No matter what you do, people are going to be very upset with you.” Sam Zimbabwe, planning director for the District Department of Transportation, was also on the panel. From the look on his face, he knows that has his work cut out for him as the agency tries to bring some measure of rationality to the city’s tangle of parking regulations. We all want to be able to park wherever we want, for as long as we want, and we want it to be free. But we might as well wish for a world of free and infinitely available ice cream. We can’t have it, and we give up a lot by trying to get there.
How to Help People Park (by Charging Them More)

A lot of people will tell you a war on cars is being waged in the District. It’s not really true, of course, but there is a heated debate over transportation in the city, and the most contentious topic is parking. The city has been accused of waging war for the increased number of parking tickets, for the proposed zoning change that would eliminate minimum parking requirements in new buildings near Metro stations, and for bike lanes that replaced parking spots. It’s an area where there’s hardly any room to maneuver without angering some very vocal residents.
Which is why it was refreshing to step out of this charged environment last night and hear about the types of parking policies that have worked in other cities across the country. Jeff Tumlin, a prominent transportation planner who lives in San Francisco and works with the consulting group Nelson/Nygaard, presented the 15 steps he deems necessary to fix parking at a panel hosted by the Coalition for Smarter Growth. His central message: Focus on what you’re trying to accomplish.
“We need to focus on outcomes,” he said, “and the primary outcome is availability.”
The spread of parking meters across the country came at the behest of downtown business owners who were concerned that people were parking outside their shops for eight hours a day while at the office and blocking potential customers from getting to the stores. The goal of the meters was to cycle people through, so everyone who wanted to find parking in the business district could.
But now, Tumlin says, we’re still using that same 1947 technology, where you insert coins and have two hours to park during business hours. It’s no longer relevant to our needs in 2013. In San Francisco, he says, 30 percent of traffic was just people looking for a parking space—that is, before the city instituted performance parking, which charges extra for people to park on the blocks with the highest demand.
So how do you reform parking to make cities as functional as possible for drivers? Here—and I warn you, this is about to get wonky—are Tumlin’s 15 steps:
1. Beware residential parking permits. Considered the holy grail among some D.C. residents, RPPs were designed to keep commuters from taking over the parking lanes of residential streets. But when demand exceeds supply—in other words, when there are many more RPPs issued than there are parking spaces—the hunt for parking continues. It’s sometimes better to charge for residential parking like you do for commercial parking; after all, who’s to say that a resident’s parking should be subsidized and protected by the city while a visiting contractor’s or a nearby customer’s should be banned? “Government,” Tumlin says, “doesn’t have much business deciding who has the right to park and who doesn’t.”
2. Meters must take credit cards. “If any of the businesses on Main Street required payment in quarters, they would go out of business,” Tumlin says. So should meters. And, while we’re at it, get rid of those pay stations that require you to walk halfway down the block to figure out what you need to do. If a city’s going to charge for parking, it has to be as convenient as possible.
3. Use smart technology like phone apps that help people find spaces. Again, this goes to convenience and efficiency, and cuts down the time spent hunting for a space (and blocking traffic).
4. Find the right price. “The right price for parking is the lowest price at which a few spots are always available,” Tumlin says. That’ll generally be a lot higher than cities are currently charing. On San Francisco’s Valencia Street, metered parking costs $4.50 an hour. On a cross street just 50 feet away, it’s $2.50. Why? That’s the price that balances supply and demand and ensures that the parking hunt won’t be futile. But it’s important to remember that the goal is not revenue, but to make it easier for people to find parking when they need it—”charging for parking is a pro-motorist strategy.”
5. Find the right time. It makes no sense to charge for parking from 9 to 5 on a street full of restaurants where parking is tightest from 7 to 10. Charge until midnight if needed. Likewise, don’t limit people to two hours of parking. Let them have dinner and a movie, and pay extra (provided they can do it conveniently with their cards or phones, not by running back to feed the meter or digging through mounds of quarters). That’s better for businesses and for drivers.
6. Invest your revenue. In Pasadena, 100 percent of meter revenue goes to the neighborhood business improvement districts to provide for cleaner streets, safety, and marketing. That’s better than putting the revenue into the city’s general fund and prompting residents to accuse the city of extortion. At the very least, a city should be clear about how the money’s being invested.
7. Be flexible. Allow restaurants and cafes to set up outdoor tables in the parking lane if they so desire. Remember, parking on retail corridors is there to serve the retail establishments. If they find that they get more business by increasing their street presence, let them do it. Outdoor tables in a parking lane at a restaurant not only give a boost to that restaurant, Tumlin says, they also help neighboring businesses by attracting people to the street.
8. Eliminate minimum requirements for off-street parking in new buildings. Not only can these be wasteful, eliminating them “is the most effective way to deliver affordable housing,” Tumlin says. Parking spaces generally run in the tens of thousands of dollars, so buildings with less parking have substantially cheaper units.
9. Replace minimums with maximums. D.C.’s Office of Planning considered this as part of the zoning update but dropped it in the face of considerable opposition and is just going for the elimination of minimums in transit zones. But Tumlin argues that maximums can help create housing choices for the minority of people without cars, who are often forced to compete for pricier homes in buildings marketed to people with cars.
10. Design parking well. Don’t degrade the pedestrian experience for cars’ sake.
11. Locate driveways well. Again, they shouldn’t turn a sidewalk into a minefield for pedestrians.
12. Unbundle parking from leases. This is related to 8 and 9. If people don’t have cars, don’t make them pay for parking in their buildings. Charge for spaces only when people demand them.
13. Encourage tandem/stack/valet parking, to save space.
14. Share. Each car-share vehicle, Tumlin says, eliminates seven to 25 vehicles from the roads. Hoboken, N.J., bribed residents with a two-year car-sharing membership and $100 to give up their RPPs, and Tumlin says it was a big success.
15. Park once. Currently, there are lots of arterial roads that are difficult and dangerous to cross, so driving from place to place is necessary, regardless of the distance. Think New York Avenue NE. By bringing the various uses along the road—schools, offices, stores—together on one side of it, connected by smaller streets, you allow people to park once and then walk to their various destinations. That cuts way down on traffic and makes for a better experience.
The District Department of Transportation’s Sam Zimbabwe, sharing the stage with Tumlin, sat grimacing as Tumlin laid out some of the aggressive measures cities like San Francisco and Los Angeles and Hoboken have taken to make parking less unpleasant, as if imagining the epic fight that these proposals would provoke in D.C. And so I asked Tumlin if these approaches might not be feasible in certain political or demographic environments, or if it really was just a question of communication.
“It’s only communication,” he replied. “No matter what a community’s issues are, being less stupid about parking is going to benefit everyone.”
Of course, making parking more expensive is not always popular. “On parking, being progressive is the opposite of being populist,” Tumlin says. “People say, ‘I want free parking, and I want a lot of parking.’ And they don’t think through the unintended consequences.”
But there’s an opportunity cost to tackling parking, Tumlin says. A city can only do so much at once, and going all out on parking means giving up other priorities. “In D.C. you decided to do bikes, and that was probably the right choice,” Tumlin says. “Washington is 100 times better on bikes and bike infrastructure than San Francisco.”
Sustainable transportation consultant Jeff Tumlin presented in Richmond and DC
I missed both presentations earlier this week by Jeff Tumlin, one of the nation’s leading sustainable transportation planners as a consultant at Nelson-Nygaard, and author of Sustainable Transportation Planning: Tools for Creating Vibrant, Healthy, and Resilient Communities. On Monday, he presented to the Partnership for Smart Growth in Richmond, to about 80 attendees, including a couple of City Council members and the city’s bike and pedestrian planner. The Richmond.com website, affiliated with the Richmond Times-Dispatch, published a thorough summary of the talk, “10 Things Every City Can Do for Sustainable Transportation.”
A North-South Highway for Northern Virginia
The McDonnell administration has unveiled its vision for a north-south highway and other improvements to Virginia’s newest Corridor of Statewide Significance. The McDonnell administration has unveiled a recommended alignment for a limited access highway to be built as the backbone of the North-South Corridor of Statewide Significance in Northern Virginia. The 45-mile circumferential highway would start at Interstate 95 in the south, swing west of Dulles International Airport and terminate at Route 7 in the north. The route would following existing highways, roads and projects contained in the comprehensive plans of Prince William County and Loudoun County. In a brief presentation of the proposal yesterday to the Commonwealth Transportation Board, Deputy Secretary of Transportation David Tyeryar justified the project on the grounds that it would help Dulles airport compete in the air cargo arena and would serve an area on the fringe of metropolitan Washington whose population is expected to grow by hundreds of thousands over the next three decades.
Getting Parking Right
Parking policy guru Jeff Tumlin will outline sixteen ways to tailor parking policies to meet parking demand while reducing some of the negative effects of current policies. D.C. Department of Transportation’s Associate Director Sam Zimbabwe will present the city’s latest thinking on how to take the lessons learned from around the country to craft parking policies that support community goals. Join us to learn about best practices and what D.C. government is planning to do to get parking right.
Group Offers Walking Tour Of White Flint
Rockville Pike can be an unpleasant place to walk. The six-lane, highway-like road along the strip malls and parking lots of White Flint is heavy on traffic and light on the type of streetscaping in Bethesda Row or even Woodmont Triangle. Montgomery County and the developers behind the many mixed-use projects planned for the corridor would like to see that change. On April 27, the group leading the charge for smart growth initiatives will offer a glimpse of what that future might hold.
Letter to Stephen Walter, Parsons Transportation Group Re: I-66 Tier 1 Draft EIS, Comments by the Coalition for Smarter Growth
Dear Mr. Walter:
The Coalition for Smarter Growth, with members and partner groups in Northern Virginia, hereby submits these comments on the Virginia Department of Transportation’s Tier 1 Draft Environmental Impact Statement for I-66 (“outside the Beltway”).
We agree that addressing transportation in the I-66 corridor should be a top priority. We are pleased that the study considers a range of transit modes and focuses on person-trips. However, we are concerned that this 2040-oriented study fails to offer a long-term, sustainable and effective solution both for 2040 and the decades following. Presuming one of the build alternatives meets the capacity needs for 2040, what happens after 2040? More lanes?
The study appears to favor the managed lane (congestion-priced, high occupancy toll lane scenario), but does that scenario really offer the long term demand reduction and capacity that a high-capacity transit with transit-oriented land use would offer?
Documentation is far too limited for why this study favors managed lanes and there is no analysis of the comparative effects on land use of each of the modes.
The most significant shortcoming is the failure to evaluate an integrated land use and transit scenario that would offer a way to more effectively reduce the growth in driving demand and provide the capacity to handle the demand that does come. We have made this comment repeatedly with VDOT studies, yet never do VDOT studies include such a scenario.
The land use discussion is particularly thin and at too high a level (see 4.1.1.1). As was found in the Tysons study, mixing uses, providing a local grid of streets, and measuring the results using more compact traffic analysis zones can show remarkable SOV trip reductions and transit mode share increases — networking these centers with Tysons could provide synergistic vehicle demand reduction benefits, while improving reliable access to jobs.
The study should evaluate an alternative land use scenario linking transit-oriented development (compact, walkable, mixed-use communities linked to transit), with land conservation of rural areas, and high capacity transit, in order to maximize transit trips, minimize vehicle trips, and to provide the means to handle future growth. The study explicitly states that it has excluded a systems oriented transit scenario, but a systems oriented transit and TOD scenario is exactly what’s needed and should be combined with TDM measures and targeted bottleneck and safety improvements in a composite scenario.
Table ES-1 shows that a transit approach matched with TDM and addressing chokepoints would rank highest in meeting the needs identified in the Purpose in Need, yet the study did not provide an integrated scenario linking transit, TDM and addressing chokepoints.
Since the Council of Governments adopted Region Forward Plan and Compact is framed as a transit-oriented future for the region, this study should have studied such a regional scenario. Once again a too narrow corridor focus improperly exclude the networked transit and TOD solution.
The Purpose and Need Statement fails to include what should be key goals for the corridor. While the stated purpose ” is to improve multimodal mobility along the I-66 corridor by providing diverse travel choices in a cost-effective manner, and to enhance transportation safety and travel reliability for the public along the I-66 corridor,” it should also include goals to reduce demand for single occupant vehicle trips (including vehicle miles traveled and vehicle trips), by increasing mode share for non-auto trips through transit and changes in land use — changes in both the location of future development and improved community design which would result in higher transit ridership. Again, looking to the long term, the stated goals cannot be met unless demand reduction goals are also a core goal and focus of this study.
In addition Purpose and Needs states, “the identified needs to be addressed include: transportation capacity deficiencies, major points of congestion, limited travel mode choices, safety deficiencies, and lack of transportation predictability,” orients the study too much toward capacity expansion and fails to include as key needs, such as reducing driving demand and improving land use to reduce driving demand and increase non-auto mode share.
The study is also artificially separated from the analysis of I-66 inside the Beltway even though a substantial proportion of inbound trips travels inside the Beltway and will have impacts all the way into D.C..
The study also inappropriately and without explanation excludes a dedicated transit and HOV scenario, leaving expanded HOV scenarios completely out of the study.
While the practice is to include all projects in the CLRP in the No Build scenario, inclusion of the controversial Route 234 extension (TriCounty Parkway western alignment) which would open up rural areas to more development and increase traffic would likely make the No Build perform worse than it would otherwise.
By separating a full tolling analysis from this story, it’s not possible to get a full picture of the effects of HOT lanes on transit usage, carpooling, general purpose lanes and parallel roadways. A full toll effects analysis should not be deferred to a separate study. Moreover the relative benefits of privately tolled should be compared to public tolling, including the ability to use public tolling to fund more transit service in the corridor.
We were very concerned by the way Tiering of the I-81 study, which also failed to study a composite solution recommended by our group, was used to later foreclose the offering of a composite alternative at Tier 2. In addition, by tying the Tiering with the concept of “projects of independent utility,” a too general and flawed Tier 1 study can then open the door to allowing VDOT to move forward with whichever project it wishes and to foreclose more effective system wide alternatives. Here, the issue may involve specific segments, but equally likely it would allow VDOT to move forward with just one component of the Integrated Concept Scenarios — such as tolled, managed lanes. In fact, the discussion of the ICS, very clearly proposes to allow VDOT to move forward with just one component. Read with other chapters of this study, it appears that the study is framed to favor the tolled, managed lanes.
The study cites the 1999 MIS in a history of previous studies but fails to note the stated preference of elected officials at that time (at least Fairfax County and probably others) for a transit-first solution.
We are also concerned that the Memorandum of Understanding, which we do not believe was subject to public comment, is also structured to focus on and favor a tolled, managed lane scenario, rather than another potentially non-tolled scenario. The study states that per the MOA, decisions on the following will be made upon completion of the Tier 1 study:
- The concepts to be advanced for the I-66 corridor, including transit improvements, transportation demand management strategies, and/or roadway improvements. Within these concepts, consideration will be given to managed lanes and tolling;
- The general location for studying future highway and transit improvements in Tier 2 NEPA document(s);
- Identification of projects with independent utility to be evaluated in Tier 2 NEPA document(s) and evaluated pursuant to other environmental laws; and
- Advancing tolling for subsequent study in Tier 2 NEPA document(s).
With points one and four focused on tolling, and the potential intention to use the “projects of independent utility” to advance only the tolled portion of an ICS, the study appears to improperly lean toward one approach over others — the tolled, managed lanes.
The entry and exit tables are confusing because it’s not clear from the use of eastern, middle and western tables where the greatest demand may lie nor what the primary origin and destination data might be.
The COG growth projections which are used by this study fail to account for the dramatic changes in demographics, market demand and energy prices, nor a future of higher energy prices. In turn, having had one of the largest expansions of the federal government in recent history shifting to a very likely downsizing, especially in defense, means that the growth projections should be reevaluated. This can mean substantially less growth in outer areas. In turn, it’s important to note that the allocation of growth within the region is a subjective exercise and that high growth assigned to outer areas is not inevitable, nor is the form of that growth.
In addition, use of percentages for growth can be misleading and tables should be provided to show the magnitude of growth. In addition, the report may overstate Gainesville/Haymarket growth while understating Tysons Corner growth.
While VDOT might argue that it is not responsible for land use, when billions of dollars are at stake, a thorough analysis of cost-effective alternatives must look at alternative growth scenarios. And simply because an agency is not responsible for a subject area like land use, doesn’t mean it shouldn’t be studied in an EIS as a potential piece of an alternative. VDOT itself has published a report on the benefits of “Transportation Efficient Land Use” yet inappropriately eliminates such demand management solutions from this corridor.
Again in chapter 3 (figure 3-1), the process for evaluating solutions is flawed by ruling out TDM and system/out of corridor solutions early in the proces.
The four step evaluation approach (3-2) is also flawed for failing to look at alternative growth scenarios and changes in land use combined with other TDM approaches, meaning that the total travel demand entered in the first step may be higher than it would otherwise be.
We don’t understand and are concerned by the statement on 3-6 that “Demand is also based on
unconstrained capacity on I-66 itself (although connecting roads were constrained) in order to
ascertain total demand.” That would seem to inflate the travel demand and overly favor capacity expansion solutions.
It doesn’t appear that the study factors in the congestion feedback signal from congestion in the general purpose lanes which would lead to higher transit use or new residents and jobs moving to transit-accessible locations as has been happening in recent years.
It’s not clear from Table 3-1 if the transit ridership numbers are based on transit-efficient land use or a continued pattern of auto dependent development in Prince William and western Fairfax, where transit efficient development might result in higher transit ridership. It’s also not clear whether the managed lane scenario counts transit trips in the lanes — trips that could also be achieved by HOV/transit lanes without tolls.
Again, Table 3-3 shows that combining transit with a chokepoints solution could meet more components of the Purpose and Need than the managed lanes.
Table 3-4 lacks adequate supporting documentation and is a virtual “black-box” to the public. The ICS alternatives fail to include non-tolled HOV with transit in any of the alternatives, which biases the study to managed toll lanes. It does not appear that the transit ridership factors in congestion feedback from the general purpose lanes.
It is unclear how Table 3-4 and Table ES-2 footprint widths are calculated.
The “Key Findings” (3-9) don’t appear to be fully substantiated. For example, it states:
- “Other than the two-lane Managed Lanes concept (ML2) which accommodates autos and buses alike, single mode improvement concepts result in large corridor width, high cost, poor efficiency, and/or inability to serve total demand.” Would that indeed be true of Metrorail or an HOV/BRT approach, with each tied to transit-efficient land use?
- Another stated finding is that: “The share of trips made either by transit or in multi-occupant vehicles for those ICSs that perform best against the Table 3-4 metrics reach over 80 percent. While accommodating such high percentages of trips by transit and multi-occupant vehicles would be very difficult, the fact that these percentages are so high is indicative of the benefit of including transit and managed lanes that can carry large numbers of person-trips as part of the solution.” If that is the case, why not use an HOV and transit solution rather than only use tolled, managed lanes with the various transit modes?
- Another stated finding is that “The projected peak period travel demands in the corridor highlight the need for a transportation solution that provides space efficiency – the ability to carry large numbers of persons within limited spaces. Managed Lanes and fixed-guideway transit (in descending order of carrying capacity: Metrorail Extension, Bus Rapid Transit, and Light Rail Transit) provide space efficiency. But do managed lanes really provide space efficiency when the interchange needs of having dual sets of ramps are factored in? The interchanges on the 495 HOT lanes have taken a substantial number of acres with a profound impact on surrounding communities.
Conclusion: It is critical to get this Tier I study right because completion of this study will likely foreclose consideration of alternatives at the Tier 2 stage. The study appears biased toward the managed lane approach by failing to analyze non-toll HOV with transit alternatives and by failing to analyze a composite transit, transit-efficient land use, TDM and chokepoint alternative (a systems oriented approach and one that would meet the regional goals in Region Forward). The study does not substantiate the footprint, ridership, table 3-4 ratios, and costs; and the “findings” are also unsubstantiated. Effects on land use are not addressed.
- We request the opportunity for additional time for peer review of this study by independent transportation planners.
- We also request that VDOT’s report on Transportation Efficient Development be considered in this study along with the goals of Region Forward.
- Finally we request that this study be delayed until the composite alternative that we highlight is analyzed using alternative growth and land use.
Thank you.
Stewart Schwartz
Executive Director
